

I have a UPS designed to run long enough to shutdown my server gracefully. I can manually turn it back on if the outage is extended.
If I was designing a critical service the ups would have enough runtime to switch over to some other power system (solar batteries, generator, second circuit, etc)
When interviewing people I do ask if they play Factorio, and if yes, I ask about their thoughts on various design constraints and strategies they explored.